A pre-update checklist for WordPress
Prepare a restorable backup, test key site actions and plan a rollback before changing WordPress core.
Start an update with a known restore point and a list of the actions your visitors need most. The amount of testing you need depends on what the website does. On a small brochure site, navigation and the enquiry form may be enough to cover the main risk. A store also needs checkout, payments and order notifications.
Know which version and components you are changing
Record the current core version and versions of active plugins and themes. Check the release announcement for the target version. Confirm the site’s PHP branch and check the requirements of your high-impact plugins. The WordPress release archive links to the upstream announcements.
Verify the restore before the update
Back up the database and files to an off-site location. Confirm the archive includes uploads, configuration and any custom installed code your site needs. Restore that backup onto staging and log in. Record how long the restore took and who can run it if a production change fails.
For a site receiving orders or new accounts, decide how you will handle data written after the backup. Put as few minutes as possible between the final backup and the change. If you need to restore the database, reconcile any activity recorded during the update window.
Test a small set of actions end to end
After applying the update to staging, clear page and object caches using the tools built into your host or plugins. Open public pages and check the logged-in dashboard. Submit each business-critical form and verify delivery. For a shop, place a test order and confirm the expected emails, stock change and payment status in the test environment.
During the production change, repeat a shorter version of these checks with a second person if available. Review the application log for fresh errors. Write down a concrete rollback trigger, such as a repeatable failed checkout or a fatal error on a high-traffic page, along with the exact restore steps.
Record what worked
Save the versions installed, test results and the restore path. If a staging test exposed an incompatibility, check which component fixed it before the next update. The record makes later updates faster and helps you spot changes that only affect production.